So let's see. Last weekend was great for building. I managed to get the main floor structure done on Saturday. The overall footprint of the expansion will be 7 feet by 20 feet as dictated by a Black Walnut tree that is bigger than I can cut down. It's all sitting on cinder blocks that I levelled, and some pretty hefty 6x6 beams, and some 4x6 beams on top of them. On Sunday I managed to get the framing done for both the end walls, and that's where it sits now. I need to get either some plywood or OSB board before I can make any more progress. I have some leads on those things, but I need to wait and see how they develop.
The walls, waiting for plywood so they can be put in place. |
Kinda boreing, but it's all I got between overtime at work and the regular April weather that keeps everything cool and wet.
I know things are dragging a bit right now, and I hope to get things revved up soon. I just gotta be patient, no matter how itchy I get sitting here thinking about all the stuff I want to do. Keep dreaming, things will be coming soon.
No comments:
Post a Comment